🛣️ Bitumen/Asphalt Calculator
Calculate bitumen, aggregate quantities, and costs for paving or roofing projects
Project Details
5%25%
$400$1,000
PROJECT AREA
200 ft²
(18.6 m²)
Material Quantities (with 10% waste)
Bitumen Required0.12 tons
125 kg or 275 lbs
Aggregate Required2.37 tons
2367 kg or 5219 lbs
Total Mix Weight2.49 tons
Mix Composition
Bitumen Content5%
Aggregate Content95%
Mix Density2400 kg/m³
Volume Required0.94 m³
Cost Breakdown
Bitumen Cost$75
Aggregate Cost$95
Labor Cost$465
Equipment Cost$93
Total Project Cost$727
$3.63/ft² or $39.12/m²
📊 Coverage Information:At 2 inches thickness, one ton of asphalt mix covers approximately 3.4 square feet. This calculator uses industry-standard densities and mix ratios for paving applications. Actual quantities may vary based on site conditions and compaction.
Paving Application Guide
🌡️
Temperature
Hot mix asphalt should be laid between 275-325°F (135-163°C). Avoid paving when ambient temp is below 40°F (4°C).
⚙️
Compaction
Achieve 92-96% density through proper rolling. Use vibratory roller within 3-5 minutes of laying.
📏
Thickness
Residential: 2-3 inches; Commercial: 3-4 inches; Heavy traffic: 4-6 inches over proper base.